Tenders
NL Revitalisering kantoor Weert — closes 11 Nov NL Flankerende maatregelen Netwerkanalyse — closes 19 Oct NL Duurzame nieuwbouw depot collecties Utrecht — closes 30 Nov NL 2027-003-OND-G Raamovereenkomst Gesloten verhardingen 2027-2031 — closes 12 Nov NL 2027-003-OND-E Raamovereenkomst Elementen verhardingen 2027-2031 — closes 12 Nov NL Raamovereenkomst DVO Civiel 2027-2030 — closes 20 Nov NL Raamovereenkomst D. Terminal Bouwkundig en Installatietechnisch Onderhoud — closes 6 Nov NL Herinrichting Vijfhoevenlaan — closes 21 Oct NL BRM Puurveenseveld — closes 10 Nov NL HVAC en RWA beheer, onderhoud en vervanging — closes 18 Nov NL Raamovereenkomst Stedin Telecom Netwerk — closes 30 Oct NL Gronduitgifte Oldebroek west 3 (Selectieleidraad ) — closes 6 Oct NL Revitalisering kantoor Weert — closes 11 Nov NL Flankerende maatregelen Netwerkanalyse — closes 19 Oct NL Duurzame nieuwbouw depot collecties Utrecht — closes 30 Nov NL 2027-003-OND-G Raamovereenkomst Gesloten verhardingen 2027-2031 — closes 12 Nov NL 2027-003-OND-E Raamovereenkomst Elementen verhardingen 2027-2031 — closes 12 Nov NL Raamovereenkomst DVO Civiel 2027-2030 — closes 20 Nov NL Raamovereenkomst D. Terminal Bouwkundig en Installatietechnisch Onderhoud — closes 6 Nov NL Herinrichting Vijfhoevenlaan — closes 21 Oct NL BRM Puurveenseveld — closes 10 Nov NL HVAC en RWA beheer, onderhoud en vervanging — closes 18 Nov NL Raamovereenkomst Stedin Telecom Netwerk — closes 30 Oct NL Gronduitgifte Oldebroek west 3 (Selectieleidraad ) — closes 6 Oct

About

A bid is a project.
So we built it one.

Why we built it

A public construction tender can run to thousands of pages, three to six addenda, a dozen formal requirements, and a submission window measured in weeks. It's prepared by people under deadline pressure — often across several companies — and a single missed change or unsigned form can make the whole bid non-conforming.

And yet most of it still runs on email attachments, shared drives and a spreadsheet someone keeps by hand. The tools that exist treat the bid as a document to store, not a project to run.

Steinlog treats bid preparation as what it is: high-stakes, deadline-driven, multi-party project work. The submission date generates the plan. Every change is attributed. A last-minute clarification is mapped to what it touches. Nothing important is left to someone remembering it at 6 p.m.

What we hold to

The record is the point

Attribution and history aren’t features bolted on — they’re how a team stays honest with itself under pressure.

AI assists, never decides

It reads, compares and drafts, always with sources. It never prices, authors engineering, or gates a submission.

EU by design

Documents and databases stay in the EU, isolated per client, and out of AI training. Assistant inference runs in Ireland (EU); OCR and embeddings are disclosed and may leave the EU. Not a setting — the default.

Who we are

A small team,
close to real bids.

We're a focused team building Steinlog with a handful of contractors in the Netherlands, Sweden and Germany — on their real tenders, not in a lab. The product changes with what those bids demand.

GENERALhello@steinlog.com
PILOTSpilot@steinlog.com
SECURITYsecurity@steinlog.com

About

Build the next bid
with us.

We work directly with a small number of contractors per market. Bring a live tender.

pilot@steinlog.com

ennl