Tenders
NL 31216364 voor het engineeren en uitvoeren van suppletiewerken langs de Nederlandse kust — closes 19 Jan NL Bouwkundig aannemer t.b.v. project Toekomstbestendig vastgoed NAD Nuis — closes 4 Dec NL Nieuwbouw laboratoriumgebouw Naktuinbouw — closes 27 Nov NL RM501006-10 Leveren en aanbrengen autobruggen — closes 12 Jan NL Rioolvervanging Oude Landgraaf en Willem van Oranjestraat — closes 15 Dec NL Dijkversterking Helderse Zeewering — closes 11 Jan NL 23960 | Nieuwbouw Permanente Militaire Presentie te Sint-Maarten — closes 12 Jan NL Geluidsschermen A1 Host City Zuidrand te Apeldoorn (P1224) — closes 21 Jan NL Dagelijkse technische dienst werkzaamheden (handyman diensten) ten behoeve van de Nederlandse Voedsel- en Warenautoriteit — closes 3 Feb NL 1-W-0077531-26: Vernieuwing van de Maasboulevardbruggen te Rotterdam (NL) — closes 21 Dec NL 1-W-0070353-26: Renovatie Jan Kuitenbrug te Rotterdam (NL) — closes 21 Dec NL AI 2026-0070 - Circulair zonnepark Buiteneiland — closes 10 Dec NL 31216364 voor het engineeren en uitvoeren van suppletiewerken langs de Nederlandse kust — closes 19 Jan NL Bouwkundig aannemer t.b.v. project Toekomstbestendig vastgoed NAD Nuis — closes 4 Dec NL Nieuwbouw laboratoriumgebouw Naktuinbouw — closes 27 Nov NL RM501006-10 Leveren en aanbrengen autobruggen — closes 12 Jan NL Rioolvervanging Oude Landgraaf en Willem van Oranjestraat — closes 15 Dec NL Dijkversterking Helderse Zeewering — closes 11 Jan NL 23960 | Nieuwbouw Permanente Militaire Presentie te Sint-Maarten — closes 12 Jan NL Geluidsschermen A1 Host City Zuidrand te Apeldoorn (P1224) — closes 21 Jan NL Dagelijkse technische dienst werkzaamheden (handyman diensten) ten behoeve van de Nederlandse Voedsel- en Warenautoriteit — closes 3 Feb NL 1-W-0077531-26: Vernieuwing van de Maasboulevardbruggen te Rotterdam (NL) — closes 21 Dec NL 1-W-0070353-26: Renovatie Jan Kuitenbrug te Rotterdam (NL) — closes 21 Dec NL AI 2026-0070 - Circulair zonnepark Buiteneiland — closes 10 Dec

04 — Collaboration & consortia

One preparer to
nine companies.

Bids are won by people who don't sit in the same building — a lead contractor, specialist subcontractors, a partner two countries away. Steinlog puts them in the same bid without flattening the boundaries that keep it safe.

The end of the attachment

final_v7_JV_edit_FINAL.docx

No more emailing versions around and merging by hand. One live bid, edited together, every change attributed — and no doubt about which file is current.

§3.2 Method statement JV MB 2 editing
illustration

Piling will be executed as driven precast in accordance with addendum №3JV, sequenced to minimise disruption to the adjacent carriageway.

Temporary works design by the appointed structural engineer, reviewed against §2.4MB.

live · saved to history 14:16
BOQ — Lot 4 · civil illustration
ItemQtyUnitRate €
210 Driven precast piles1,240m148.00
211 Pile caps86nr920.00
212 Excavation, structural3,400m³38.50
213 Reinforcement412t1,180.00
per-cell edits attributed · rates are yours, never AI-generated

Answer library

Your best answers,
one search away.

Certificates, references, CVs, method statements — the material you reuse on every bid, versioned and searchable. Visible to your team only. It is never shared with consortium partners, no matter how the bid is assembled.

Consortium data rooms

Partners see the bid.
Never your library.

Partner accounts are scoped to a single project and see only the documents you have included in the bid — never your answer library, never another project. Everyone works from the same current version, and every partner access is on the record.

Access boundary — project “Hofvijver Quarter” illustration

LEAD

Van Dijk Bouw

ANSWER LIBRARY

Certificates, CVs, method statements

NEVER SHARED

SHARED BID

Bid-included documents only

  • tender_response_v2.6
  • boq_lot4_final
  • structural_calcs_rev_c
  • all partner access logged

PARTNER · scoped to project

Nordbygg AB

PARTNER · scoped to project

Müller Stahl GmbH

The combinatie itself

Who is in the bid,
and who is blocking it.

Before anyone can submit, the combinatie has to exist on paper: penvoerder and combinant, each with its KVK registration and its own required artefacts. Steinlog holds that register inside the bid and says plainly what is still in the way.

The combinatie, registered demo project · live tender data
The combinatie panel: penvoerder Van Dijk Bouw and combinant Iv Installatietechniek registered with their KVK numbers and addresses, each with its own required-artefact count, under a banner naming the combinatie-eisen that block submission.

A live TenderNed tender in the demo bid room; the two firms are fictional. The banner is the gate talking — no per-combinant requirements are seeded yet, so the combinatie is flagged as blocking submission rather than quietly passing.

Free partner accounts, per-company pricing, cross-border NL/SE consortia — see Consortium data rooms.

Collaboration

Run a consortium bid
without the chaos.

Bring a live consortium tender and we'll set up the data room with you.

ennl